Newsroom
  • Xella.com
  • Contact
  • en
  • |
  • de
  • News
  • Press
    • Media Library
  • Themes
    • Company
    • Digitalization
    • Innovation
    • People
    • References
    • Sustainability
  • About
Search
  • en
  • |
  • de
  • News
  • Press
    • Media Library
  • Themes
    • Company
    • Digitalization
    • Innovation
    • People
    • References
    • Sustainability
  • About

How the Ytong building system fills the historic district in Milan with life

Milan's historic Affori neighborhood has been undergoing redevelopment since 2016. In this context, new residential complexes are being built in the immediate surrounding of the nearby metro stations, filling the neighborhood with life again. Residents benefit from the sustainable advantages of Xella products.

02 August, 2022

High-performance, sound-insulating, and fire-resistant - these are important properties in the construction of apartment buildings. Standards that ensure the safety of the people who live there and are the highest priority during construction.

It is these properties and standards that convinced the construction company SILE Costruzioni Srl, based in the province of Bergamo, to use Ytong Climagold blocks and Multipor insulation boards for the residential project in Affori.

Sustainable and insulating with Ytong building systems

Low weight leads to a reducing load on the supporting structure. For this reason, Xella Italia used Ytong Climagold blocks, each 30 and 40 cm thick. The special feature: Despite their low thickness, they are thermally insulating, sound-insulating, and fire-resistant.

The Multipor M3 mineral insulation boards, on the other hand, were used to correct the thermal bridge. Heat thus remains in the rooms and does not escape to the outside through the outer facade. This saves residents heating costs during the cold season.
 
As far as the mortar for laying the bricks is concerned, Ytong FIX N200 was chosen, while Multipor FIX X700 was selected for bonding the boards. The combination of mortar, slabs, blocks and building systems resulted in increased performance of the housing complexes and a significant reduction in the construction and planning phase. This reduced project costs.

The future of the project

The project involves the construction of several residential complexes, divided into three construction phases. In 2018, the first section was completed. In September 2021, work began on the second residential complex with a total of 178 apartments.

The Ytong building system was used by the construction company S.I.L.E for other projects. These were not only residential complexes, but also commercial buildings that have to meet further and higher standards.

Share this news

E-mail page Print page

More sustainability news

  • When technology meets sustainability: relocating a ball mill

    After providing reliable service for nearly two decades at the German plant in Wedel, the ball mill has found a new home at the AAC plant in Mios, France. This logistical feat has become a real showca

    View more
  • How Xella strengthens mental health at work

    How can companies create conditions for people to stay healthy, motivated, and productive in the long run? At Xella, mental health is part of the answer - and a cornerstone of our sustainability strat

    View more
  • If we take the circular economy seriously, we need common standards

    How a six-month test program for recycled autoclaved aerated concrete (AAC) materials could lay the foundation for industry-wide standards. A conversation with Dr. Oliver Kreft, responsible for circul

    View more

Links

 

Links

  • Company
  • Digitalization
  • Innovation
  • People
  • References
  • Sustainability
  • LinkedIn
  • Youtube

Introduction

2025 Xella International. All rights reserved.

Links

  • General Terms and Conditions
  • Privacy Policy
  • Imprint
  • Terms of Use