Innovative process shortens high-rise construction by three months
Creative solution and intelligent cooperation between the crafts saves a lot of time during the construction of the 23-storey residential tower "De Hoge Regentesse" and masters logistical challenges of the small, central building site in The Hague.
Is it possible to speed up the construction of a high-rise building by three months? Yes, you can. Xella and developer Van Wijnen have shown how this works on a 23-storey high-rise building south of the city center of The Hague, the Netherlands – with a creative solution for a fast shell construction system and, above all, successful cooperation between the trades involved:
The secret lies in the early pre-positioning of the Ytong material, which is later used for the partition walls. Since Ytong autoclaved aerated concrete is insensitive to moisture, it is no problem to deliver it already in the construction phase. "The challenge was to get the pallets into the building envelope early and accurately without getting in the way of the piping and installation work," says Bas Peereboom, Business Development Manager at Xella Nederland.
(picture on the right: HD architecten)
After the piping work on the floor has been completed, a centrally positioned crane lifts the pallets with the individually assembled materials to the respective floor. There it places the packages on already placed autoclaved aerated concrete blocks. Only then is the floor filled with foamed concrete – at exactly the same height as the autoclaved aerated concrete blocks. While the screed hardens, the next floor is laid. At the same time, the Ytong partition walls can already be raised on the hardened screed with the previously placed material.
Compared to a traditional building method, this procedure saves three days per floor and creates one floor per week. As a result, the entire residential tower with its 23 floors can be completed about three months earlier – which is expected to happen in early 2021.
Drivers of this innovative process were the colleagues from Xella Cellenbeton Nederland BV in cooperation with the developer Van Wijnen as well as the suppliers Bestcon, Faber and various installers.
Our colleague Bas Peereboom shows the process on video (in Dutch).
And in Belgium, too, the construction time is shortened in this way – in the building of 60 social housing units in Bruges: see for yourself!
More sustainability news
-
Xella Polska shows the way: how to keep employees happy in the long termĀ
From health workshops to psychological support and programs for employees' children: there is much to learn from our Polish colleagues' wide range of well-being programs. Beata Molska and Marta Prokop
View more -
Circularity in construction: working with partners in Belgium
What does urban mining look like in practice? To learn more about this, we have been working for two years in a funded project on sustainability in the construction industry. The challenge: to create
View more -
Faster, bigger, better: improving shippings via the Danube river
Almost a year ago, Xella Romania organized the first barge transport of Xella products from Serbia across the Danube river. Waiting for the right moment, the team finally managed to surpass itself.
View more
Introduction
2024 Xella International. All rights reserved.