Newsroom
  • Xella.com
  • Contact
  • en
  • |
  • de
  • News
  • Press
    • Media Library
  • Themes
    • Company
    • Digitalization
    • Innovation
    • People
    • References
    • Sustainability
  • About
Search
  • en
  • |
  • de
  • News
  • Press
    • Media Library
  • Themes
    • Company
    • Digitalization
    • Innovation
    • People
    • References
    • Sustainability
  • About

Large-format and solid construction in record time

Reach the finished room height with only one stroke? This is possible with the storey-high Ytong System Wall Elements (SWE).

31 March, 2020

Compared to small-format bricks, the SWE can save up to 73 percent of construction time. A product that is economical, efficient and quick to process at the same time, which is why Xella has been awarded the 2019 Innovation Prize.

For the Ytong SWE, no more cuts are necessary on the construction site, because the aerated concrete components are prefabricated. The wall elements can be moved immediately on site by crane, so that no scaffolding is needed. This means that a storey can be erected in less than a day.

Great advantages, with which the Ytong system wall elements are particularly suitable for serial construction of terraced, semi-detached and multi-family houses. Their use optimizes work and construction speed as well as costs, while at the same time Ytong provides the best material properties: high thermal insulation, high load-bearing capacity and built-in fire protection.

An additional advantage: building projects that are executed with storey-high Ytong system wall elements are particularly well suited for the use of blue.sprint, Xella's digital planning service.

#Slider #Ytong #Ytong SWE #blue sprint #Innovation #1 #2020

Share this news

E-mail page Print page

More sustainability news

  • How to integrate responsibility into every step from production to recycling?

    At Xella, sustainability is our DNA and influences our practices throughout our entire value chain - from energy production to responsible use of raw materials.

    View more
  • Kick-off of ReloAD: working together toward circular construction logistics in Brussels 

    What if every leftover block on a construction site could start a new life instead of ending up as waste? That’s the vision behind ReloAD—an innovative project aimed at making the logistics flows

    View more
  • When technology meets sustainability: relocating a ball mill

    After providing reliable service for nearly two decades at the German plant in Wedel, the ball mill has found a new home at the AAC plant in Mios, France. This logistical feat has become a real showca

    View more

Links

 

Links

  • Company
  • Digitalization
  • Innovation
  • People
  • References
  • Sustainability
  • LinkedIn
  • Youtube

Introduction

2025 Xella International. All rights reserved.

Links

  • General Terms and Conditions
  • Privacy Policy
  • Imprint
  • Terms of Use