In Poland, Xella has taken over existing production facilities and subsequently modernized them technically. In some plants, considerable investments had to be made for this – including in Teodory. There, extensive modernization work was most recently carried out on the entire infrastructure in January 2019, including a refurbishment of the buildings.
Tomasz Wiśniewski, CTO of Xella Polska: “We also want to show that we are a stable and reliable employer in the region. In addition, Xella Polska attaches great importance to acting as a partner to the local community. We want to actively participate in the life of the region and cooperate fruitfully with the authorities and our neighbors.”
Always up to date: Teodory
A lot has happened at our CSU plant in Teodory, Poland. Thanks to extensive investments, not only efficiency and product quality, but also plant safety have been significantly increased.
Plant Manager Dariusz Chankiewicz pointed out the great importance of the second investment step, which included the renovation of the plant buildings and their energy refurbishment through a comprehensive improvement of thermal efficiency. “The plant's employees actively participated in this process of revitalization and modernization. They helped renovate and repaint the facilities, participated in cleaning work around the buildings or renewed the fences. Through this work, we have grown together into a strong team,” explained Chankiewicz.
An important aspect of the modernization was to increase occupational safety by using even more advanced systems. Work areas on the machines were secured by barriers and the introduction of a key exchange system. A lean manufacturing tool was also successfully introduced with the 5S method. This involves better organization of the workplaces, which is already being reflected in noticeably higher efficiency and occupational safety.
Since the modernization, the factory has been working in three shifts. As a result, a new production record was set just a few days after the introduction. Moreover, since the renovation, the plant has achieved high results in external audits for CE mark and the highest product quality among all six Silka plants in Poland.
More company news
-
Our Tuzla plant receives Bosnia's first EPD in the building materials sector
Our Ytong plant in Tuzla has been a cornerstone of sustainable construction since its reconstruction in 2009. With a strong focus on quality, safety, and environmental responsibility, we are proud to announce that in early 2025, Xella Bosnia received an externally verified Environmental Product Decl
Read more -
20 years of Xella Serbia
As early as the mid-2000s, Xella expanded into Central and Eastern Europe. The Serbian Kolubara plant was acquired in 2004, marking Xella's first step into Serbia. Dragan Lazic, CEO South-East Europe market area, has been part of the transformation as the former CFO of Xella Serbia, and is himself a
Read more -
The Xenia Project – Building Community and Inclusion with Il Germoglio
By cooperating with il Germoglio, Xella Italy supports a local initiative near their Pontenure plant, offering people in need integrative work.
Read more
Introduction
2024 Xella International. All rights reserved.